The 2023 Culver Sidewalk Program will open at 8 a.m., Monday, April 3, 2023. The program intends to work with homeowners to replace sidewalks.
The program reimburses the homeowner a set per-square-foot amount for sidewalks and per lineal-foot for curb and curb/sidewalk combination (when the sidewalk and curb are next to each other). This amount is set by the Culver Town Council. This IS NOT a 50/50 program. It is the homeowner’s responsibility to obtain a contractor, provide the town specs, and pay for services.
Applications will be available at www.townofculver.org/documents/sidewalk-program/ after March 14. Completed applications, including a sketch of the property and sidewalk to be replaced, will be accepted via email beginning at 8 a.m. local time, Monday, April 3, 2023. Applications will be reviewed in the order they are received after 8 a.m. Applications may be emailed to kheim@townofculver.org. Applications will be accepted through July 1 or until the funds set aside for the sidewalk program are committed, whichever is first. Applications for completed projects do not qualify and will not be accepted.
Once applications are received, they will be reviewed by the Utility Superintendent and the measurements will be confirmed by him or one of his employees. The town reserves the right to make adjustments to measurements based on the conditions of the site and will not participate in any concrete placed outside the measurements applied for.
If your site qualifies for the program, you will receive a letter from the Culver Clerk-Treasurer confirming your participation, the amount of reimbursement, and the next steps. Please do not start your project until you have received the confirmation letter.
Sidewalks and curbs must meet ADA and town specifications to qualify for reimbursement. You are responsible for making arrangements with a contractor and providing the town specifications to them. You also are responsible for safety marking during construction, removing the rubble, and returning the construction area to its original condition.
Before placing concrete, you or your contractor must call the utility superintendent for an inspection. He can be reached at 574.292.3943. Failure to do so will result in the loss of reimbursement and may result in the replacement of the concrete at the owner’s expense.
If there are any further questions, please call Town Hall at 574.842.3140.
Kratos completes $50 million state-of-the-art hypersonic systems payload integration facility in Indiana
Fatal motorcycle-semi crash Saturday morning
Lane closures, traffic pattern shift to impact I-70 in both directions in Vigo County
Take a ride in aviation history in Terre Haute this weekend
Know Now! available for safety messages in Vermillion County
FSSA to text HIP members about HIP work requirements
South Vermillion among Student Advisory Committee Grant recipients announced
Deadline is Wednesday for Indiana reserved hunt applications
Concerts, cancellations announced for Indiana State Fair performances
Canoe rental bus - Jeep crash with multiple injuries Friday
World Food Championships introduces the WFC Culinary Combine at Indianapolis this fall
Ivy Tech Terre Haute / Greencastle to enhance dual enrollment with local foundation grants
Monday declared Air Quality Action Day across Indiana with changing weather pattern on horizon
U.S. Attorney’s Office hosts fraud forum, announces creation of fraud task force in Southern District of Indiana
